Footbridge fix at Sidmouth ford ‘an accident waiting to happen’

PUBLISHED: 12:30 23 April 2018

Before: damaged footbridge

Before: damaged footbridge

Archant

A temporary fix on a damaged footbridge has been slammed as a ‘bodged job’.

Damaged section of the bridge over the ford in Sidmouth.Picture: Jonathan BradnockDamaged section of the bridge over the ford in Sidmouth.Picture: Jonathan Bradnock

Jonathan Bradnock, known around the town as ‘The Barefoot Gardener’, says he reported a hole on the footbridge at the ford months ago.

The Council carried out a repair but that soon became damaged. Now another temporary fix has been carried out.

“I think it’s terrible,” Mr Bradnock said. “It’s a bodged job. It’s not even flat. An elderly person may not see that and fall straight over. It’s an accident waiting to happen.”

Councillor Stuart Hughes, responsible for Highways at Devon County Council, said: “Soon after the damage was reported, we made the bridge safe. Unfortunately because the ford is closed due to high water levels we have been unable to carry out a full inspection.

“We will make carry out a permanent repair at the earliest opportunity. While the permanent repair is being carried out we may need to close the bridge.”


If you value what this story gives you, please consider supporting the Sidmouth Herald. Click the link in the orange box above for details.

Become a supporter

This newspaper has been a central part of community life for many years. Our industry faces testing times, which is why we're asking for your support. Every contribution will help us continue to produce local journalism that makes a measurable difference to our community.

Comments have been disabled on this article.

Latest from the Sidmouth Herald